Two pivotal areas define the way we’ve shaped our firm to deliver more to our clients:
We don’t stand apart. When briefed by a client we become an embedded part of the team. We engage our depth of knowledge and commercial acumen to swiftly identify what’s required from the outset – and set about delivering it. It’s not a revelatory approach, but it is refreshing, competitive and deeply efficient – and enjoyable.
It has earned us a market reputation as a leader in our areas of expertise where we have established:
A substantial public and private sector client base.
Regular appointments to nationally significant projects.
“They operate with a level of charisma in the room – certainly not order takers. They sense the gaps then find the solutions.”
To ensure our specialists are always where they’re needed, we operate as one firm with hubs in Auckland, Wellington and Christchurch. We advise on a range of public and private sector projects.
The Greenwood Roche resource management team, led by Partner Francelle Lupis, has assisted Generus Living Group to obtain fast-track consent under the COVID-19 Recovery (Fast-track Consenting) Act 2020 for the construction of the 13-storey Pearson Residences building in Parnell, Auckland.
The Pearson Residences building is the third and final stage of The Foundation, a $500 million retirement village in central Auckland, designed by Peddlethorp architects and officially opened by the Prime Minister in March this year.
Pearson Residences is located in the centre of the Foundation precinct, surrounded by Foundation Building 1 and Building 2, Birthcare, Pearson House, ACG Parnell College, the Jubilee Hall and Foundation on George Street building. The resource consent authorises the construction of the 48m central building, containing 65 retirement units and care facilities, a range of resident amenities, two levels of basement carparking, landscaping and a pedestrian airbridge connecting to Building 2.
Brigid McArthur and Vimal Nair have recently completed for Rio Tinto and New Zealand Aluminium Smelters a suite of new 20-year electricity contracts, including ground-breaking demand response contracts.
The new deal ensures the Tiwai Point aluminium smelter remains open after years of uncertainty around its future, a massive relief for employees, Southland and Tiwai’s many stakeholders.
This uncertainty has long unsettled NZ energy markets and deterred investment in new renewable generation.
The overall deal replaces NZAS’ previous Electricity Agreement with Meridian Energy, a long‑term contract for differences providing NZAS with hedge cover for up to 572 MW.
Under the new arrangements, hedge cover for up to 572 MW in aggregate is provided by three different generators (Meridian Energy, Contact Energy and Mercury NZ) through a portfolio of different CfDs. The challenge was to ensure the rights and obligations, risks and operational management of the different contracts work alongside each other seamlessly, having regard to the separation between them.
NZAS is the country’s single largest electricity consumer, taking around 13% of NZ’s electricity supply. The new deal also includes separate contracts with Meridian and Contact that enable them to call on NZAS for various different tranches of demand response. In effect, NZAS can be required to dial back production when there is a shortage of power in the grid. The smelter therefore acts as a battery for the NZ electricity system, ensuring the lights are kept on when NZ needs it most.
On 22 July 2024 resource consents and a notice of requirement were granted / approved under the COVID-19 Recovery (Fast-track Consenting) Act 2020 authorising the construction of the ancillary services facilities that will support the operation of the New Dunedin Hospital - Whakatuputupu.
Resource consent was granted for the stage 1 foundation works on 23 December 2021, for the stage 2 Outpatient building on 17 August 2022 and for the stage 3 Inpatient building on 24 November 2023. This fourth and final stage of the consenting process will authorise the construction and operation of supplementary, ancillary services facilities necessary for the operation of the two main clinical buildings – the Inpatient and Outpatient buildings.
The facilities will comprise a generator building, a heat pump/chiller enclosure, a services gantry extending over Castle Street and connecting to the Inpatient building, and associated equipment including two diesel storage tanks. They are to be located on the “Bow Lane” block to the east across Castle Street from the main facilities which are located on the “Cadbury” and “Wilson” blocks. Construction works are set to begin on the facilities within the coming months.
A team from Greenwood Roche led by Rachel Murdoch and Francelle Lupis are advising Te Whatu Ora on all consenting matters relating to the New Dunedin Hospital.
Greenwood Roche recently acted for New Zealand Rural Land Company Limited (NZRLC) in relation to a restructure of its property portfolio.
The project involved transferring 14,487 hectares of rural land, predominantly dairy and forestry, and all interests and property rights held in relation to those properties, from NZRLC’s subsidiary, NZRLC Dairy Holdings Limited, to a new limited partnership, New Zealand Rural Land Investments Limited Partnership.
The transfer to New Zealand Rural Land Investments Limited Partnership was to facilitate NZRLC selling a 25% equity interest in its land portfolio to Roc Partners (an Australian specialist private markets investment manager) for NZ$44.2m. Greenwood Roche also successfully acted for NZRLC on the property and finance aspects of the sale to Roc Partners.
The Greenwood Roche team was led by Jeannie Warnock (Partner), Anthony Staples (Partner), Kurt McRedmond (Senior Associate), Tom Petersen (Lawyer) and Georgie Pay (Lawyer) with specialist input from other lawyers within the firm.
On 24 November 2023 resource consent was granted under the COVID-19 Recovery (Fast-track Consenting) Act 2020 for the above-ground construction works and subsequent operation of the new Inpatient building at Dunedin Hospital.
Resource consent was granted for the stage 1 foundation works on 23 December 2021 and for the stage 2 Outpatient building on 17 August 2022. The granting of this subsequent consent will enable the establishment of the new Inpatient building, the largest of the clinical buildings comprising the new Dunedin Hospital.
As the primary tertiary healthcare facility for the Southern region, the new Inpatient building will house a range of consultation and treatment spaces, including an intensive care unit, a dedicated primary birthing unit and an expanded emergency department. In addition to the dedicated clinical facilities, the Inpatient building site will also accommodate generous areas of landscaping and public realm extending primarily along the Cumberland Street frontage of the site. Works on the Inpatient building are anticipated to commence in Q1 2024.
A team from Greenwood Roche, led by Julian Smith, Monique Thomas and Rachel Murdoch, are advising Te Whatu Ora on all consenting and property matters relating to the New Dunedin Hospital.
On 26 July 2023 an expert consenting panel granted Hughes Developments Limited’s Faringdon Oval application under the COVID-19 Recovery (Fast-track Consenting) Act 2020.
Faringdon Oval is a 69.3ha extension of the existing, well established Faringdon community in Rolleston, which has developed over the last decade under the Operative Selwyn District Plan, the Housing Accords and Special Housing Areas Act 2013, and more recently, the COVID-19 Recovery (Fast Track Consenting) Act 2020.
The Fast Track consent for Faringdon Oval authorises the subdivision, land use and associated activities needed to facilitate the addition of 684 residential units to the Rolleston housing supply with an additional 462 residential units to be enabled through super lots with minimum density requirements. The development will support a range of residential housing types and densities, high quality landscaping, open space reserves, a neighbourhood centre and a network of transport links to existing residential areas and the Rolleston town centre.
Greenwood Roche is delighted to have assisted HDL in delivering a development that will contribute significant housing supply in such a strategic location for the wider Canterbury region.
The Law Association of New Zealand Incorporated (TLANZ) has unveiled new versions of its previously ADLS-branded agreement to lease and deed of lease, aimed at providing landlords and tenants with more options and embracing a number of recent commercial leasing trends.
On 25 November 2024, TLANZ (rebranded from the Auckland District Law Society Inc. (ADLS)) released new forms of:
The new forms (and more particularly the deed of lease) have been significantly updated to reflect industry feedback and current market practice over the last 12 years, while providing more flexibility and still intending to represent a relatively balanced position for use by both landlords and tenants. However, they are still not a “one-size-fits-all” solution, some updates favour one party over the other compared to the existing ADLS forms, and parties will need to consider their position carefully when negotiating leases on the new forms.
So what has changed?
One of the most significant changes is the updating of the first schedule to the lease forms to provide for a number of additional commercial variables. However, parties will need to exercise caution with the “plug and play” approach adopted by TLANZ, and default positions apply if they are not completed.
Key changes/highlights:
The above are key changes only. There are a number of other changes that also require consideration and comment when using these forms. We can help navigate the changes. Please reach out to one of our team below for advice on how the new lease could impact your leasing transactions either as a landlord or a tenant. Clicking on their name below will take you through to their profile on our website where you will find their contact details.
Mark Hay Antonia Shanahan Mark Anderson Jane McDiarmid Michael Bennett
The Ministry of Housing and Urban Development (MHUD) has recently announced a time-limited underwrite initiative aimed at stimulating residential construction activity during the economic recovery.
The Residential Development Underwrite (RDU) is targeted towards developments which:
For successful applicants, the RDU involves the Crown committing to buy a specified number of houses within a residential development for which the developer cannot secure pre-sales, at an agreed discount to the market price. The RDU will, arguably, enable developers to achieve the funding pre-conditions set by their lenders, boosting supply to the market in the next 6 to 12 months.
MHUD is now inviting applications for the RDU. The applicant must:
In addition, the development must have a minimum of 30 houses or, if the development is staged, the relevant stage must have a minimum of 30 houses.
Priority will be given to developments which can deliver the most houses (in locations that most need them) for the least risk and cost to the Crown. This means MHUD will favour those developments situated in the main centres (primarily Auckland, Hamilton, Tauranga, Wellington and Christchurch), which have a lower number of houses needing pre-sales underwritten, and a lower underwrite price. Developments which need 100% of pre-sales underwritten will not be accepted. While most developments are likely to be located in the main centres, developments in other locations may be considered where such developments meet the criteria.
There is no price cap on the sale of houses within a development, meaning the RDU is not limited to providing an underwrite for affordable housing only.
Applications will be generally assessed against the following assessment framework:
Risk and net cost to the Crown 35%
Project readiness 25%
Volume and nature of supply 20%
Location 20%
More details in relation to the assessment framework for RDU and the application process can be found on the Ministry of Housing and Urban Development website*. Applications opened on 7 October 2024 and, while MHUD has specifically indicated that the availability of the RDU is time-limited, no final closing date for applications has yet been specified. MHUD has been clear that applications are not being assessed on a “first come, first served” basis and are encouraging applicants to take the time necessary to prepare high quality applications.
*Click on the wording Ministry of Housing and Urban Development website in the article above to follow the link.
In a recent slew of announcements, the Government has unveiled transformative reforms aimed at streamlining the building consent system and boosting efficiency in New Zealand’s struggling building sector.
On 29 September 2024, the Minister for Building and Construction, Chris Penk, announced that the Government is beginning to investigate options for a major reform to building consenting.
The Government considers this reform necessary to combat increasing building costs and productivity concerns, and incentivise sector growth and development. There are also concerns over inconsistent practices and building code interpretations across the 67 building consenting authorities (BCAs), a barrier to standardisation of design, construction techniques and build quality.
Proposal for building consent authority reform
In what would be the most significant shake-up of the building consent system since the 1991 reforms, the Government is exploring three key changes:
When asked by Newstalk ZB about the timing of possible legislation, the Minister said:
Whether we are going along the lines of allowing councils that already want to band together and have done some work along those lines … that would be relatively short, that would be as early as the start of next year… but if you were going to more of a single point of contact across the country, potentially setting up a new entity for doing that, then maybe its going to be a bit longer, either way we want to move really quickly, we’ve been having conservations all year about it, it’s not like this is the start line, we are quite well advanced, even though we are saying now formally we want to engage and get some thoughts on those particular three options we’ve narrowed down to.
Arguably, the most significant part of Minister Penk’s announcement is that the Government is also reviewing liability settings, with an opportunity to reconsider the liability of BCAs and the duties of care owned by BCAs under the new regime. If these changes were to gain traction, they have the potential to bar claims against BCAs (as is already the case in some other jurisdictions) or limit such claims. The ability to bring claims against BCAs for negligence in relation to building consent activities has become part of the New Zealand legal and construction landscape over the past few decades, with regular actions being brought against BCAs. Legislative intervention to protect BCAs from claims in negligence represents a “watch this space” event for the whole construction sector.
In the Minister’s opinion, the risk of negligence claims has led to BCAs taking a conservative and risk-averse approach, negatively impacting productivity, increasing construction costs and delaying project consenting and completion. He states that the Government’s overarching ambition is to move towards a more enabling, risk-based and proportionate approach to consenting.
Immediate changes (minor variations)
On 1 October 2024, the Minister announced immediate changes to the Building Regulations to clarify the definition of a “minor variation” and introduce a definition of “minor customisation”. These changes are part of a move to enable small changes (such as the substitution of products) to be made to building plans without the need to apply for a building consent amendment, introducing greater flexibility for architects, builders and owners.
Public consultation
This was followed on 2 October 2024, by the Government’s release of its public discussion document, setting out wider proposals to reduce delays in the building inspection process. Previously signalled in July, the document centres around plans to increase the use of remote inspections to make the building and consenting process more efficient and affordable. The implementation of remote inspections by default seeks to improve productivity by reducing the need for inspectors to travel, in turn allowing more inspections to take place in a day, and resources to be shared across regions, improving access, efficiency and consistency.
Public consultation is now open and will run until 29 November 2024. BCAs, homeowners and other construction stakeholders are encouraged to offer feedback on options which include:
This overhaul takes place in the context of the Government’s broader reforms to the building sector, including such as promoting competition in the building supplies industry through the introduction of the Building (Overseas Building Products, Standards, and Certification Schemes) Amendment Bill, on which the Transport and Infrastructure Committee is currently receiving public submissions until 14 November 2024.
Get in touch
Reform of this scale is rare and the implications will be wide-reaching. Greenwood Roche will be following these developments closely, supporting our clients to submit on and navigate the changes. Reach out to one of our team below for advice on how these changes could impact your projects. Clicking on their name below will take you through to their profile on our website where you will find their contact details.
Barry Walker, Amy Rutherford, James Riddoch, Rob Harris, Vimal Nair, Geoff White, Jordan Ropati, Tanya Young
Go to https://www.mbie.govt.nz/have-your-say/consultation-on-increasing-the-use-of-remote-inspections-in-the-building-consent-process for the discussion document.
The Court of Appeal has recently overturned a decision of the High Court concerning the extent to which a purchaser can rely on representations regarding the NBS rating of a commercial building contained in an Initial Seismic Assessment, in circumstances where those representations turn out to be incorrect. While the High Court found that the representations in that case amounted to a misrepresentation under section 35 of the Contract and Commercial Act 2017, the Court of Appeal disagreed with that decision, restoring the principle of buyer beware in relation to seismic matters in sale and purchase transactions.
If you would like to know more about this case or require advice in connection with the sale of a commercial building, please contact Kelly Johnson or Mark Anderson from our property and real estate team.
In this article we explain some of the key aspects to check as potential purchasers of renewable energy projects – particularly solar farms – are lured with “ready to build” developments.
Numerous small (and often reasonably recently formed) entities are touting for sale interests in renewable energy farms in New Zealand, particularly solar farms, some with battery storage. Their targets are mainly overseas developers with deep pockets and little familiarity with New Zealand laws or energy markets.
Our experience in acting for purchasers on several of these reveals differing levels of readiness in projects described as secured, consented and otherwise ready to build.
Aspects to check in particular are:
To talk about investing in a renewable energy project with experienced lawyers, please contact Brigid McArthur, Nick Dunn or Vimal Nair.
On 7 March 2024, the Government announced proposed amendments to the Overseas Investment Act 2005 (Act) to create a new streamlined approval pathway for build-to-rent (BTR) housing developments, and on 11 June 2024, the amendment Bill was introduced.
Build to Rent Developments
BTR developments are a form of privately-owned rental housing comprising 20 or more dwellings, which are ordinarily owned and professionally managed long-term by an institutional investment entity such as a pension fund. The rentals are typically for longer term tenancies, giving tenants increased housing certainty, reliable property maintenance services and access to shared development amenities such as cafes, gyms, media rooms and co-working spaces.
BTR developments are increasingly popular in Australia and the United Kingdom. While it is a newer housing model in New Zealand with only 22 registered developments so far, it is believed there is high potential for growth in the sector.
Industry groups such as the Property Council have been advocating for changes to the Act in order to increase affordable rental stock in New Zealand, and reduce investment barriers for New Zealand and overseas developers and institutional investor owners. BTR developments are currently viewed as a risky investment as a potentially stranded or illiquid asset class. There is little incentive to build or buy a BTR development considering the risk that developers may be stranded with the asset if New Zealand investors have insufficient capital to acquire it, and overseas investors face strict hurdles to entry under the Act. It is hoped that streamlining the test will increase both overseas and New Zealand investor confidence in BTR developments, with greater certainty that investors can exit and on-sell to a larger pool of purchasers.
Current Position
Currently, under the Act, applications for the creation of new BTR developments, or the acquisition of existing BTR developments, must proceed under either:
The Amendment Bill
The much anticipated Bill was released on 11 June 2024, setting out the proposed new streamlined pathway, called the “large rental development test”.
The large rental development test is for residential but not otherwise sensitive land being acquired as an existing large rental development (provided investor requirements are met). It will allow the acquisition of existing developments that are not increasing the housing supply, to proceed under the large rental development pathway, rather than the benefit to New Zealand test. This is intended to reduce the illiquidity risk of developers being unable to on-sell BTR developments where an investor would have to otherwise increase the housing supply to qualify for the streamlined increased housing test.
Land which is otherwise sensitive, will still need to proceed under the benefit to New Zealand test. The existing streamlined pathway under the increased housing test will continue to apply for new or expanding BTR developments which are increasing the housing supply.
The new test is also intended to enable other types of large rental developments that are functionally the same as BTR but may not be the same housing type, such as worker accommodation.
The large rental development test streamlines the consent process where:
Consent will be conditional on investors continuing to make at least 20 of the dwellings available for residential tenancy, otherwise the owner must divest their interest in the asset. Owners no longer need to be “in the business of providing residential dwellings” in the rent-to-buy or shared equity space, as they did previously.
There will be an opportunity to provide feedback on the Bill at the Select Committee stage.
Associate Minister of Finance Hon David Seymour’s Ministerial Directive Letter to the OIO on 6 June 2024 (Directive Letter)) which was a prelude to the Bill, together with the explanatory note in the Bill, emphatically encourages BTR housing developments as a means of addressing the housing crisis and attracting overseas investment. In anticipation of the Bill being passed later in the year, the Minister has directed the OIO to consider investment in housing supply and the operation of existing large scale housing developments as a benefit under the benefit to New Zealand test. The Minister considers that the benefits that flow from addressing the risk of stranded assets and from the continued operation of an existing large scale housing development may be sufficient to satisfy the benefit to New Zealand test even if no other benefits will result from the investment.
The Directive Letter and the introduction of the Bill are a clear pronouncement to overseas investors of the Government’s support of BTR developments, indicating the doors are opening for increased investment in this space.
If you have any questions on the Bill, or are an overseas investor considering investing in BTR developments or land to develop in New Zealand, please contact Brigid McArthur, Ranui Calman, Annabel Crawford or Anna Hickmott from our Overseas Investment team.